ATI Model F12/D Gas Transmitter Part 5 Maintenance
80
O&M Manual (Rev-H)
3. Remove the Internal Shield by removing the three screws (4)
4. Remove the Terminal PCB by pulling straight up, to expose the CPU PCB (5).
5. Remove the Battery (6), and replace with same kind.
6. Reverse steps 4 through 1 to re-assemble the unit.
7. After powering up the unit, set the data and time.
a. Note: You will be forced to disable Auto-test on startup until the clock has been set.
4
6
5

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ATI Technologies F12/D and is the answer not in the manual?

ATI Technologies F12/D Specifications

General IconGeneral
BrandATI Technologies
ModelF12/D
CategoryTransmitter
LanguageEnglish