9. Commissioning (basic settings)
1. Set selector switch to position 0 (OFF).
Information: The selector switch is not a mains switch. When positioned to 0
(OFF), the actuator cannot be operated.The controls' power supply is
maintained.
2. Switch on the power supply.
Information:Please consider the heat-up time for ambient temperatures below
–40 °C.
3. Perform basic settings.
9.1. Heat-up time for low temperature version
Please note that for low temperature versions, the controls require a heat-up time.
This heat-up time applies if both actuators and actuator controls are not live and
have cooled down to ambient temperature. Under these conditions and after
connection to the voltage supply, the following heat-up times must be complied with
prior to commissioning:
For –40 °C = 5 min.
For –60 °C = 40 min.
9.2. Switch compartment: open
The switch compartment must be opened to perform the following settings.
1. Loosen screws [2] and remove cover [1] from the switch compartment.
43
SA 25.1 – SA 48.1 / SAR 25.1 – SAR 30.1
AM 02.1 Commissioning (basic settings)