x
Chapter 5. SETTINGS BEFORE STARTING OPERATION 5-1
5 - 1 PV Input
5-2
PV range type setup 5-2
Temperature unit setup 5-4
Decimal point position setup 5-5
PV range low limit/high limit setup 5-6
5 - 2 Control 5-7
Control method setup 5-7
Control action (Direct/Reverse) setup 5-8
Heat/Cool control selection setup 5-9
Heat/Cool control dead zone setup 5-10
LSP system group setup 5-12
5 - 3 Internal Event 5-13
Event operation type setup 5-20
Event Direct/Reverse, standby, and Event state at READY setup 5-21
Event main setting setup 5-22
Event sub-setting setup 5-23
Event hysteresis setup 5-24
5 - 4 CT (Current Transformer) Input 5-25
CT type setup 5-25
CT output setup 5-26
CT wait time before measurement setup 5-27
5 - 5 Continuous Output 5-28
Output range setup 5-28
Output type setup 5-29
Output scaling low limit/high limit setup 5-30
MV scaling range 5-31
5 - 6 Communication 5-32
Communication mode setup 5-32
Station address setup 5-33
Transmission speed setup 5-34
Data format (data length) setup 5-35
Data format (parity) setup 5-36
Data format (stop bit) setup 5-37
5 - 7 Key Operation 5-38
Mode key function setup 5-38
User level setup 5-39
5 - 8 DI Assignment 5-40
Internal contact operation type setup 5-40
Chapter 6. SETTINGS DURING OPERATION 6-1
6 - 1 SP
6-1
SP setup in operation display mode 6-1
LSP No. setup 6-2
SP setup in parameter setting display mode 6-3