EasyManua.ls Logo

Barco DP2K SLP Series

Barco DP2K SLP Series
175 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. ICMP
Image 7-20
5. Switch on the projector.
In case y ou replace one HDD (e.g. degraded mode) the ICMP automatically starts with the RAID recovery
process. The red LED o f the HDD which has to b e rebuilt is blinking. This process takes ab out 200 GB per
hour. Once the RA ID is completed the red LED turns off.
CAUTION: It’s strongly recommended to com plete the RAID recovery process prior to starting a show. This
to ensure that the content integrity is preserved and that the show is n ot interrupted.
R5906847 DP2K SLP SERIES 02/06/2017 81

Table of Contents

Other manuals for Barco DP2K SLP Series

Related product manuals