98 Maintenance
CFPP Process Analyzer CFPP-4.2 03/2016
Very cold components and coolant!
Risk of skin damage on direct contact.
FOR THIS REASON:
- Wear protective gloves and protective goggles.
Note: For closing the open coolant lines prepare blind plugs. Suitable blind plugs you
find in the measuring unit enclosure.
• For opening the screw connections (2) displace the Amaflex insulating. For absorbing
of coolant prepare a cleaning cloth. Open the screw connections. Close the coolant
lines with the blind plugs.
• Open the four locks (4) of the measuring cell housing.
Note: At the bottom side of the cover are located the heat exchanger with peltier
elements and other electrical components. The cover is connected to the
measuring cell housing with a connecting cable via a plug connection at the
bottom of the measuring cell housing.
• Lift the cover (3) gently. Separate the connecting cable from the measuring cell
housing by disconnecting the connector at the bottom of the measuring cell housing.
• Remove the cover in complete.