68 Maintenance
CFPP Process Analyzer CFPP-4.2 03/2016
10.1 Safety during Maintenance
Danger if maintenance work is not carried out correctly.
- Before starting work on electrical components, or on components
carrying product or other substances, or on the protective devices:
Switch off the power supply and secure it, so that it cannot be
switched on accidentally.
- After switching off the power to the analyzer, wait for at least 5
minutes before you open the control box (to allow hot surfaces to
cool down and electric charges to decrease).
- For certain tasks, a hot-work permit from the operating company is
required.
Danger if unsuitable spare parts ar
e used!
- Use only spare parts from BARTEC BENKE. Other components may
not meet the required safety standards, particularly for explosion
protection.
No explosion protection due to using incorrect spare parts!
Some optional used spare parts are modified by BARTEC
BENKE for a
particular purpose. The use of non
-modified original spare parts of the
cturer can cause loss of explosion protection.
:
• Only use spare parts from BARTEC BENKE.
BARTEC BENKE cannot accept liability if maintenance is not carried out correctly.
10.1.1 Qualification of Personnel
Inspection and maintenance personnel must be qualified in accordance with the standards
EN 60079-17 / IEC 60079-17 (experience, training, knowledge about installation
procedures, types of protection, rules and regulations, etc.).