Maintenance 83
03/2016 CFPP Process Analyzer CFPP-4.2
To remove the measuring cell, proceed as follows:
• Switch off the analyzer and secure it, so that it cannot be switched on accidentally
(see chapter 9.3).
• Close the shut-off valve of the product feed line.
Fig. 10.5: Measuring cell
1 Plug nipple for black pipe
2 Plug nipple for red pipe
3 Plug nipple for green pipe
4 Connectors for the temperature
sensors
5 Connectors for the liquid sensor
6 Screws decondensation ring
7 Quick-release coupling of the red pipe
8 Quick-release coupling of the
green pipe
9 Fixing screw
10 Union nut sample temperature
sensor
11 Decondensation ring
12 Drain pipe
• Pull off the connector (4) for the temperature sensors and the liquid sensor (5).