EasyManua.ls Logo

BARTEC BENKE CFPP-4.2 - Page 94

BARTEC BENKE CFPP-4.2
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
92 Maintenance
CFPP Process Analyzer CFPP-4.2 03/2016
Fig. 10.14: Sample container (without sample)
The liquid level of the sample should correspond to the level mark on the sample
container.
If it does not, measure the distance between the liquid level and the level mark and
make a note of it, then adjust the liquid level (see chapter 10.14.2).
Empty the sample container and clean it.
The measuring cell can now be reassembled and reinstalled.
Check all O-rings. If there are signs of damage, replace the O-ring.
Fig. 10.15: O-ring sample container
10 O-ring of the sample container
5 Red plastic ring
Apply a small amount of mounting paste to the O-ring (10) of the sample container.
To mount the sample container, hold the red plastic ring (5), not the glass body (4).
10
5

Table of Contents

Related product manuals