Recommissioning
Operation manual b maXX BM4100 (NWR)
Document no.: 5.04052.09 Baumüller Nürnberg GmbH
130
of 142
12.6
12.6 Recommissioning
Execute commissioning as with a new device, see
ZMountingfrom page 49, ZInstallationfrom page 59.
.
CAUTION!
Recommissioning without forming of the capacitors.
From six months storage period on, the capacitors are destroyed during commission-
ing, if they are not formed beforehand
m Reform the DC link capacitors:
n by supplying the device ready-to-operate for at least one hour with
supply voltage
n but do not transmit a pulse enable during this time.
m Consider, that it is imperative, to connect the accordingly prescribed line commu-
tating reactor for this forming procedure.Devices, where no line commutating reac-
tor is necessary can directly be supplied with mains voltage.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baumuller b maXX 4100 Series and is the answer not in the manual?

Baumuller b maXX 4100 Series Specifications

General IconGeneral
BrandBaumuller
Modelb maXX 4100 Series
CategoryInverter
LanguageEnglish

Related product manuals