EasyManua.ls Logo

Baumuller b maXX 4100 Series - Recommissioning

Baumuller b maXX 4100 Series
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Recommissioning
Operation manual b maXX BM4100 (NWR)
Document no.: 5.04052.09 Baumüller Nürnberg GmbH
130
of 142
12.6
12.6 Recommissioning
Execute commissioning as with a new device, see
ZMountingfrom page 49, ZInstallationfrom page 59.
.
CAUTION!
Recommissioning without forming of the capacitors.
From six months storage period on, the capacitors are destroyed during commission-
ing, if they are not formed beforehand
m Reform the DC link capacitors:
n by supplying the device ready-to-operate for at least one hour with
supply voltage
n but do not transmit a pulse enable during this time.
m Consider, that it is imperative, to connect the accordingly prescribed line commu-
tating reactor for this forming procedure.Devices, where no line commutating reac-
tor is necessary can directly be supplied with mains voltage.

Table of Contents

Related product manuals