49
of 142
Operation manual b maXX BM4100 (NWR)
Document no.: 5.04052.09
6MOUNTING
The device is designed for mounting in a control cabinet.
Mounting consists of the following steps:
1 Prepare mounting
(for drill holes/cut-out segments, see ZDrilling patterns– from page 53)
2 Install
(fixing see ZMounting instructions– on page 55)
6.1 Safety notes
NOTE!
Mounting shall only be performed by employees of the manufacturer or by other qual-
ified personnel.
Qualified personnel are persons who – on account of their occupational training, ex-
perience, instruction and knowledge of relevant standards and stipulations, accident
prevention regulations and operating conditions – are authorized by the persons re
-
sponsible for the safety of the facilities to perform the respective activities that are
necessary, while at the same time recognizing and preventing any potential risks.
The qualifications necessary for working with the device are, for example:
m Occupational training or instruction in accordance with the standards of safety en-
gineering for the care and use of appropriate safety equipment.