EasyManua.ls Logo

Böhnke + Partner bp308 - Page 19

Böhnke + Partner bp308
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 EN 81
EN 81-2 regulations :
We providently point to the fact that BÖHNKE + PARTNER do not
accept any liability for damages that might be traced back to the
adherence to EN 81-2 regulations! Example: Re-levelling of a
hydraulically operated elevator even in case that the runtime monitor-
ing has responded due to a phase failure.
20 Installation Manual System »bp308« – Standards

Table of Contents