Instruction Manual for Lenus Care Bed
Page 68
Test cycles (230-volt system with mains cable)
Visual inspection, electrical measurement
and functional check:
Annually* and before putting the bed
into service for the first time
Test cycles (24-volt system with power adapter)
Visual and functional check:
Annually* and before putting the bed
into service for the first time
Every ten years, if the annual visual
and functional inspection was passed
*: We recommend the inspection cycles indicated. In the case of verifiable compliance
with the 2 % error rate (also see DGUV 3: §5, Table 1B), the inspection cycle can be
extended to a maximum of 2 years on the operator’s own responsibility.
Operating current test procedure
Preparation:
o Unplug the power adapter from the mains socket.
o Plug the power adapter into the test socket on the test device.
• Test procedure:
o Make the following selections on the instrument: Leakage current test: direct or
differential current in accordance with DIN EN 62353
o Perform a leakage current test in accordance with the instructions provided by
the test device manufacturer.
• Limit value:
o Leakage current I
AB
< 0.1 mA.
• If damage or a malfunction is suspected, the bed must be withdrawn
from service immediately and disconnected from the mains supply
until the defective parts have been repaired or replaced!
Please use the inspection report templates included below for your inspections.