138
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: 3FZ
Refitting (continued).
Refit:
- The upper timing cover.
- The RH engine support (2).
- The torque reaction rod (5).
The screw (1), tighten to 4,5 m.daN.
The screw (6), tighten to 4,5 m.daN.
Continue the refitting operations in reverse order to removal.
Refit the auxiliary drive belt (see corresponding operation).
B1EP1BUC
C8
Angl.T3-page032-190-2005 4/02/05 15:15 Page 138