167
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: RHL - RHR
Tools.
[1] Kit of plugs : (-).0188.T
[2] Double flywheel setting peg : (-).0188.X
[3] Camshaft setting peg : (-).0188.M
[4] Belt clamp : (-).0188.AD
[5] Pinion centrer : (-).0188.AH
[6] Flywheel lock : (-).0188.F
[7] Pulley extractor : (-).0188.P
Removing.
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Slacken the front RH wheel bolts.
Raise and support the front RH side of the vehicle.
Disconnect the negative terminal of the battery.
Remove the under-engine sound-deadening, the front RH wheel, the front RH splash-shield, the engine
cover.
Remove the auxiliaries drive belt (see corresponding operation).
Uncouple, plug and move aside, using tool [1]:
- The fuel delivery pipe (1).
- The fuel return pipe (2).
Suspend the engine, using a workshop hoist.
Remove the torque reaction rod (3) and the RH engine support (4).
C5
B1BP31DC
Angl.T3-page032-190-2005 4/02/05 15:15 Page 167