EasyManua.ls Logo

CITROEN C8 2005 - Page 162

CITROEN C8 2005
355 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
158
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: 9HZ
B1BP32CC
Tools.
[1] Flywheel setting peg : (-).0194.C
[2] Camshaft setting peg : (-).0194.B
[3] Crankshaft setting peg : (-).0194.A
Removing.
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The auxiliary drive belt (see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (2).
- The exhaust line (at the flexible pipe).
C5
Angl.T3-page032-190-2005 4/02/05 15:15 Page 158

Table of Contents

Related product manuals