Qm.
NOTE:
If the reactive power is measured, then the measurement method should
match the method used for active power measurement, i.e. if the setpoint I/E-
Pm meas is set to CT INPUTS, the I/E-Qm meas should not be set to
ANALOG INPUT and vice versa. If the setting differs, the measurement for
both active and reactive power are both taken from CT input. Setting NONE
can be used in any combination without changing the setting of the second
measurement.
11.2.1.12 Setpoint: PeakLevelStart
PeakLevelStop .. 32000 [kW]
If the object consumption (Object P) exceeds this setpoint for time longer
than PeakAutS/Sdel, the gen-set group is started. Adjusting the
PeakAutS/Sdel to 0 (OFF) disables the autostart. See also the setpoint
PeakLevelStop.
NOTE:
The IM-NT output Sys Start/Stop must be connected to the inputs Sys
Start/Stop of all controllers in the group. This can be done either physically by
wires or by CAN bus using shared peripherial modules. See the GenConfig
help for more information about shared modules.
11.2.1.13 Setpoint: PeakLevelStop
If the object consumption (Object P) drops below this setpoint for time longer
than PeakAutS/Sdel, the gen-set group is stopped (if there isn't any other
reason to keep the group running, such as binary input Rem Start/Stop). See