5-6
Ultron HPH Series
(Rear View)
Expansion
Screw x 2
M10 Screw
x 2
1
2
Ground
Balance
Support
(Figure 5-4: Balance Support Installation_ Rear of the UPS)
WARNING:
,I\RXGRQ¶WXVHWKHEDODQFHVXSSRUWVWR¿[WKH836RQWKHJURXQGWKHXQLW
might topple over. For safety concerns, please use the balance supports to
¿[WKH836WRWKHÀRRU
5
Follow 5.5 Wiring to perform wiring procedures.
6
Follow 5.6 External Battery Cabinet Connection Warnings to connect the external
battery cabinet(s).
7
$IWHU¿QLVKLQJWKHSURFHGXUHVDERYHFORVHWKH836IURQWGRRU
5.5 Wiring
5.5.1 Pre-wiring Warnings
NOTE:
1. Before wiring, please ensure that you have followed 5.4 Fixing the UPSWR¿[
WKH836LQWKHGHVLJQDWHGLQVWDOODWLRQDUHD¿UPO\
2. Before wiring, please read 5.5 Wiring thoroughly.
3. Only authorized Delta engineers or service personnel can perform installation,
wiring, panel & cover removal, maintenance and operation. If you want to
execute any action mentioned above by yourself, the action must be under the
supervision of authorized Delta engineers or service personnel.