2-8
Ultron HPH Series
(Figure 2-3: How to Open the UPS Front Door)
(Push)
90°
2.6 Internal View
WARNING:
Only authorized Delta engineers or service personnel can perform installation,
wiring, panel & cover removal, maintenance and operation. If you want to execute
any action mentioned above by yourself, the action must be under the supervision
of authorized Delta engineers or service personnel.
After you open the UPS’s front door, you will see the internal mechanisms including
communication interfaces, 3 power modules (for 160kVA)/ 4 power modules (for 200 kVA),
an STS module and fours switches (Input/ Bypass/ Manual Bypass/ Output). Please refer to
Figure 2-4.