Use
the following
basic sequence
of
steps
to install the
UPS:
1.
Create
an installation plan for the UPS
system
(Chapter
3).
2.
Prepare
your site for the UPS
system
(Chapter
3).
3.
Inspect
and unpack the UPS
cabinet
(Chapter
3).
4. Unload and install the UPS
cabinet,
and wire the
system
(Chapter
4).
5. Inspect internal battery string, ensure internal breaker at open state, connect battery positive and negative
connections
6. Install
features, accessories,
or
options,
as applicable (Chapter
4).
7.
Complete
the Installation Checklist (Chapter
4).
8
..
Have
authorized service personnel perform
preliminary
operational checks
and start up the
sy
stem.
NOTE
Startup
and
operational checks
for parallel
systems
or
installations
with
accessor
y
cabinets must
be
performed
by an
authorized
Eaton
Customer
Service
Engineer,
or
the
warranty terms
may
become
void. This
service
is
offered
as part of the
sales contract f
or
the UPS.
Contact
an Eaton
service representative
in
advance
(usually a
two-week notice
is required) to
reserve
a
preferred startup
date.
CAUTION
It
must
be
ensured
that no line input
source
can
accidentally
be
connected
to the UPS
during
inst
allation.
WARNING
Installation may only be carried out by qualified
technicians
and in
conformity
with
the
applicable
safety
st
andards.
The UPS unit is not
suitable
for
IT
or
corner-earthed power distribution
sy
stems.
3.1
Creating an Installation
Plan
Before installing the UPS
system,
read and
understand
how this manual applies to the
system
being
inst
alled.
Use the
procedures
and
illustrations
in
paragraph
3.2 and
Chapter
4 to
create
a
logical plan for installing
the
sy
stem.
3.2
Preparing the
Site
For the UPS
system
to
operate
at peak efficiency, the installation site should
meet
the
en
vironment
al
parameters
outlined in this manual. If the UPS is to be
operated
at an altitude
higher than
1000m
(3300f
t),
contact
an Eaton
service representative
for
important information
about high altitude
operation.
The
operating environment must meet
the
weight, clearance,
and
environmental requirements specified.
3.2.1
Environmental and Installation
Considerations
The UPS
system
installation
must meet
the following
guidelines:
The
system must
be installed on a level floor
suitable
for
computer
or
electronic
equipment.
The
system must
be installed
on clean, dust-free, stable
concrete, non-corrosive,
non-combustible
3-1