Installation
Checklist
All
packing
materials
and
restraints
have
been removed
from each
cabinet.
The
UPS
cabinet
is placed in its installed
location. Refrain from installing UPS direct under Air con duct.
All
conduits
and
cables
are properly
routed
to the UPS and any ancillary
cabinets.
All
power cables
are properly sized and
terminated.
Neutral
conductors
are
inst
alled.
A ground
conductor
is properly
inst
alled.
Building alarms are wired
appropriately. (Optional)
LAN drops are installed.
(Optional)
LAN
connections
have
been completed. (Optional)
The REPO device is
mounted
in its installed location and its wiring is
terminated
inside the UPS
cabinet. (Optional)
A jumper wire is
connected between
pins 3 and 4 on the REPO terminal block if using a
normally-
closed
REPO
switc
h.
(Optional)
All
terminal cover
plates
are
inst
alled.
A
ccessories
are
mounted
in installed
locations
and wiring is
terminated
inside the UPS
cabinet.
(Optional)
Air
conditioning equipment
is installed and
operating
correctly
.
The area around the installed UPS
system
is clean and
dust-free.
(Eaton
recommends
that the UPS
be installed on
a
level floor
suitable
for
computer
or
electronic equipment.)
A
dequate
workspace exists
around the UPS and other
cabinets.
A
dequate
lighting is provided around all UPS
equipment.
A 230 Vac
service
outlet is
located
within 7.5
meters
(25 feet) of the UPS
equipment.
Startup
and
operational checks
are
performed
by an
authorized
Eaton
Customer
Service
Engineer,
for
parallel
sy
stems
or
installations
with
accessory cabinets.
Parallel System Installation
Checklist
Each
cabinet
in the parallel
system
is placed in its installed
location. Refrain from installing UPS direct
under Air con duct.
All
conduits
and
cables
are properly
routed
to the UPSs and to the parallel tie
cabinet.
All
power cables
are properly sized and
terminated.
Neutral
conductors
are installed
between cabinets
as
required.
Ground
conductors
are properly
inst
alled.
CAN wiring
between
the UPSs is properly
inst
alled.
Pull chain wiring
between
the UPSs is properly
inst
alled.
A
dequate
workspace exists
around the UPSs, parallel tie
cabinet,
and other
cabinets.
Startup
and
operational checks
are
performed
by an
authorized
Eaton
Customer
Service
Engineer,
for
parallel
sy
stems.
Eaton 93E MK2 UPS (10-40kVA, 380/400/415V) Installation and Operation