UPS
Installation Plan and Unpacking
T
able
3-3. 93E MK2 Required
Clearances
93E MK2
Required Clearance
for paralleled
adjacent
UPS or UPS and
adjacent PDU
Ambient L1(mm) L2(mm)
25
o
C
30
o
C
35
o
C
40
o
C
Notes:
600 50
L1-
clearance
to the rear
w
all.
L2-
clearance between
the
adjacent
paralleled UPS or UPS and
adjacent
PDU. Parallel UPS should be
as
close
as
possible.
Some models
that
feature
rear
connections
also require additional rear
clearance
to
enable
installation
and
connection.
CAUTION
If
battery systems
are
located
in the
same
room as the UPS, the
battery manuf
act
urer's
environmental requirements
should be followed if they are more
stringent
than the
UPS
requirements. Operating
temperatures
above the
recommended
range will result in
decreased
battery
life and
performance,
and may
reduce
or void the
battery
w
ar
rant
y
.
The UPS ventilation
requirements
are
shown in
Table
3-4.
T
able
3-4. Air
Conditioning or
V
entilation
Requirements During Full Load
Operation
Model Power Rating
Input
/
Output
V
oltage
Heat Dissipation (KC/H)
93E MK2-10I-9AH-MBS
10 kVA
380/380 400/400
415/415 523
93E MK2-10I-9AH-MBS
15 kVA
380/380 400/400
415/415 862
93E MK2-10I-9AH-MBS
20 kVA
380/380 400/400
415/415 1149
93E MK2-10I-9AH-MBS
30 kVA
380/380 400/400
415/415 1723
93E MK2-10I-9AH-MBS
40 kVA
380/380 400/400
415/415 2298