4.7
Initial
Startup
Startup
and
operational checks
for parallel
systems
or
installations
with
accessory cabinets must
be
perf
ormed
by an
authorized
Eaton
Customer
Service
Engineer,
or the
warranty terms
may
become
void. This
service is
offered
as part of the
sales contract
for the UPS.
Contact
an Eaton
service representative
in
advance
(usually
required three days) t
o
reserve
a
preferred startup
date.
4.8
Completing the Installation
Checklist
The final
step
in installing the UPS
system
is
completing
the following Installation
Chec
klist.
This
c
hec
klist
ensures
that you have
completely
installed all
hardware, cables,
and other
equipment. Complete
all
items listed
on the
checklist
to
ensure
a
smooth
installation. Make a copy of the Installation Checklist
before
filling
it
out,
and retain the
original.
After the installation is
complete,
an Eaton
Customer
Service
Engineer must
verify the
operation
of the
UPS
system
and
commission
it to
support
the critical load. The
service representative cannot perform an
y
installation
tasks
other than verifying
software
and
operating setup parameters.
Service
personnel
may
request
a copy of the
completed
Installation Checklist to verify all applicable
equipment installations
have
been
completed.
NOTE
The Installa
tion Checklist MUST be
completed
prior to
starting
the UPS
system f
or
the first
time.
Eaton 93E MK2 UPS (10-40kVA, 380/400/415V) Installation and Operation