EasyManua.ls Logo

Ecotech Serinus 40 - 6.4.5 Full Leak Check

Ecotech Serinus 40
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service
Page 101
Figure 55 Plugged Sample, Background, and Calibration Ports
3. Enter the Main Menu Analyser State Status Menu Pressures & Flow Menu and
compare the cell and the manifold pressures.
4. Allow 5 minutes for the pressures to stabilise.
5. If the two pressures are within 10% of each other, then the leak check has passed.
6. If the pressure readings (cell and manifold) are more than 10% different, perform a pressure
calibration (refer to Section 5.6) After this is completed repeat the quick leak test, if this fails
again then perform a full leak check (refer to Section 6.4.5).
7. Enter Main Menu Service Menu Diagnostics Valve Menu. Then set sample/cal to
Open. Follow steps 3 and 4 if the two pressures (cell and manifold) are within 10% of each other
the leak check has passed.
8. Enter Main Menu Service Menu Diagnostics Valve Menu. Then set sample/cal to Open
and Internal Zero/cal to Open. Follow steps 3 and 4 if the two pressures (cell and manifold) are
within 10% of each other the leak check has passed.
9. If any of the tests failed or if you suspect a leak then perform a manual leak check.
6.4.5 Full Leak Check
Equipment Required
Source of vacuum (pump)
Vacuum gauge
Shut off valve
Swagelok ¼” blocker nuts

Table of Contents

Related product manuals