Serinus 40 User Manual 2.2
Items Received
With the delivery of the Serinus 40, you should have received the following:
Ecotech Serinus 40 instrument PN: E020040
Software CD PN: S040001
Manual PN: M010028 (hardcopy optional)
USB Stick PN: H030021
Power Cord (120V)* PN: C040007
Power Cord (240V)* Australia PN: C040009
Europe PN: C040008
UK PN: C040010
*The power cord received depends on the power supply of the country (120V or 240V).
Note: Please check that all these items have been delivered undamaged. If any item appears
damaged, please contact your supplier before turning the instrument on.
2.2 Mounting/Installing
When installing the instrument the following points must be taken into account:
The analyser should be placed in an environment with minimal dust, moisture and variation in
temperature (20-30°C for U.S. EPA designated range)
For best results the analyser should be located in a temperature and humidity controlled
environment (air conditioned shelter). An enclosure temperature of 25-27°C is optimum
Whether in a rack or placed on a bench, the instrument should not have anything placed on top
of it or touching the case
Instruments should be sited with easy access to the front panel (instrument screen/USB flash)
and to the back panel (communication ports/pneumatic connections)
It is recommended that the sample line be as short as possible and/or a heated manifold be used
for sampling (minimising moisture condensation in the sample)
Do not pressurize the sample line under any circumstances. Sample should be drawn through
the instrument under atmospheric pressure. This should be achieved by using an external
vacuum pump connected to the exhaust port of the analyser
When supplying span gas, ensure the flow is approximately 1 lpm and excess is sufficiently
vented
Note: The power on/off switch is accessible from the rear of the instrument only. Site the analyser so
that the on/off power switch is accessible.