EasyManuals Logo
Home>Edwards>Water Pump>EXT70

Edwards EXT70 User Manual

Edwards EXT70
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
B722-40-880 Issue F
Page ii © Edwards Limited 2013. All rights reserved.
Edwards and the Edwards logo are trademarks of Edwards Limited.
Contents
3.7 Serial interface mode ..................................................................................................27
3.7.1 Connect the serial interface to the customer control equipment ..............................................27
3.7.2 Serial enable .............................................................................................................28
3.7.3 Serial protocol ...........................................................................................................28
3.7.4 Message structure .......................................................................................................29
3.7.5 Command set ............................................................................................................30
3.7.6 Simultaneous parallel and serial operation .........................................................................30
3.7.7 Multi-drop mode ........................................................................................................33
3.8 Vent options, vent valve connection and control ..................................................................34
3.8.1 Manual vent valve ......................................................................................................34
3.8.2 TAV5 or TAV6 solenoid vent valve ....................................................................................34
3.8.3 Controlled venting ......................................................................................................34
3.8.4 Alternative valve connected to the vacuum system ..............................................................35
3.9 Cooling ...................................................................................................................36
3.9.1 Introduction .............................................................................................................36
3.9.2 Forced air cooling .......................................................................................................36
3.9.3 Water cooling ............................................................................................................36
4 Operation ........................................................................................ 39
4.1 Configuring the DX pump using serial commands ..................................................................39
4.1.1 Power limit setting .....................................................................................................39
4.1.2 Powering a fan from the podule ......................................................................................40
4.1.3 Controlled venting options ............................................................................................40
4.1.4 Standby speed setting ..................................................................................................41
4.1.5 Normal speed setting ...................................................................................................41
4.1.6 Timer setting and options .............................................................................................42
4.1.7 Analogue signal options ................................................................................................43
4.1.8 Electronic braking options .............................................................................................43
4.1.9 Factory settings .........................................................................................................44
4.1.10 Assigning a multi-drop address .......................................................................................44
4.2 Configuring the DX pump using a TIC ................................................................................45
4.3 Start-up ..................................................................................................................45
4.3.1 Close the vent valve ....................................................................................................45
4.3.2 Pre-start checks .........................................................................................................46
4.4 Operation with parallel control and monitoring ...................................................................46
4.4.1 Start the pump ..........................................................................................................46
4.4.2 Running at standby speed .............................................................................................46
4.4.3 Stop the pump ...........................................................................................................46
4.4.4 Parallel monitoring .....................................................................................................47
4.5 Operation with serial control and monitoring ......................................................................47
4.5.1 Delayed start ............................................................................................................47
4.5.2 Start the pump ..........................................................................................................47
4.5.3 Standby speed ...........................................................................................................47
4.5.4 Stop the pump ...........................................................................................................48
4.5.5 Temperature readings .................................................................................................48
4.5.6 Link parameter readings ...............................................................................................48
4.5.7 Measured motor speed .................................................................................................48
4.6 Simultaneous parallel and serial operation .........................................................................49
4.7 Operation with a TIC ...................................................................................................49
4.8 Decelerating and venting ..............................................................................................49
4.9 Operation at extreme conditions .....................................................................................49
4.9.1 Operation with high inlet pressure ...................................................................................49
4.9.2 Operation at high temperatures ......................................................................................50
4.9.3 Operation at over-speed ...............................................................................................50
4.9.4 Electrical supply failure ...............................................................................................50
4.10 Bakeout ...................................................................................................................51
5 Maintenance ..................................................................................... 53
5.1 Introduction .............................................................................................................53

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Edwards EXT70 and is the answer not in the manual?

Edwards EXT70 Specifications

General IconGeneral
BrandEdwards
ModelEXT70
CategoryWater Pump
LanguageEnglish

Related product manuals