Display Unit iDT-002
MT-91E-A01-B
Page 14
INSTALLATION OF THE DISPLAY UNIT IDT
-002
3
Installation:
1. Connect CN1 of the communication cable to the X1 connector of the display unit iDT-002, and
secure it with the screw (see Figure 7). The recommended tightening torque of the CN1 fixing
screw is 0.40 to 0.45 Nm.
2. Connect CN2 of the communication cable to the X5 STP-LINK connector of the STP pump (see
Figure 7).
To display unit iDT-002 X1
Standard L=3m
To STP pump X5
1
Fixing screw
3
Ferrite core
5
Label
2
CN1
4
Banding band
6
CN2
Figure 7 - Communication cable