CHAPTER 7 — DEMAND REPORTS
ElNet
Meter
can generate reports that will inform the user the date of
the maximum demand. The reports include:
Maximum Demand – for active power and power factor.
Maximum Demand – for reactive power and power factor.
Maximum Demand – for apparent power and power factor.
Maximum Demand – for current.
The
ElNet
informs
the value of the demand and the relevant power
factor, the time. The date, for all three phases, the demand is the
maximum value within the predefine time interval specified by the
user.
Press F1 in order to select I / PF - Current / power factor maximum
Demand.
Press F2 in order to select P / Q / S active / reactive / apparent power
Demand
Press F4 in order to see the power factor together with the power
demand.
Press F3 “DATE” in order to change the time interval within which the
ElNet
will check the maximum demand.