EasyManuals Logo

EMC VNX Series Installation Guide

EMC VNX Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #86 background imageLoading...
Page #86 background image
CAUTION
Ensure that you install the 1U front bezel on the Control Station. The 1U front bezel
for the Control Station has a lock on the front of the bezel and is labeled 1U bezel on
the back of the bezel.
DO NOT install the 1U filler panel. The 1U filler panel does not have a lock on the
front of the bezel and is labeled 1U filler on the back of the filler panel. The 1U bezel
has inlets on the bezel all the way through the bezel to allow cooling air to be drawn
through the front and circulated to the Control Station.
If airflow through the rack and the Control Station that occupy it is blocked or
restricted, or if the ambient air being drawn into the rack is too warm, an
overtemperature condition within the rack and the Control Station that occupies it
can occur causing the Control Station to fail.
Figure 63 Attaching a bezel
Setup
86 EMC VNX Series VNX5600 Unified Installation Guide

Table of Contents

Other manuals for EMC VNX Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EMC VNX Series and is the answer not in the manual?

EMC VNX Series Specifications

General IconGeneral
Management InterfaceUnisphere
Drive SupportSAS, NL-SAS, Flash (SSD)
RAID LevelsRAID 0, 1, 3, 5, 6
Protocols SupportedFibre Channel, iSCSI, NFS, CIFS
Data ServicesDeduplication, Compression, Snapshots, Replication
ProcessorIntel Xeon
Operating SystemVNX Operating Environment (block), VNX File Operating Environment (file)

Related product manuals