Electrical connection Liquiline System CA80SI
28 Endress+Hauser
5. Release the six screws on the electronics compartment cover using a Phillips-head
screwdriver and fold out the cover towards the front.
A0036445
1 Screws of electronics compartment cover
2 Screws of carrier board
6. Replace the cable glands in order versions G' and NPT: Replace the already
installed M-thread cable glands with the enclosed G’- or NPT cable glands. This does
not affect the M32 hose glands.
For cabinet versions, the cable length is approx. 4.3 m (14.1 ft) from the base of the
housing.
For analyzer stands, the cable length is approx. 3.5 m (11.5 ft) from the foundation.
The terminal connection is located under an additional protective cover in the upper
section of the device.
7. Guide the cables through the cable glands on the bottom of the device.
A0036036
1 Sample outlet hose "D" and either sample inlet hose SP1 and SP2 (1-/2-channel version) or SPx
(4-/6-channel version)
2 Outlet hose "W"
3 4-/6-channel version: Cable connection for panel
4 Connections for sensors, signal lines
5 Power cable
8. Route the cables on the rear panel of the device so that they are properly protected.
Use cable clips.
9. Guide the cable to the electronics compartment.
10. Use the 6 screws to secure the electronics compartment cover after connecting.
11. Use the 6 screws to secure the carrier plate after connecting.
12. Tighten the cable glands on the bottom of the device to secure the cables.