EasyManua.ls Logo

Enertech EAV060 - Installation Introduction; Inspection; Pre-Installation Steps

Default Icon
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Enertech Global
EAV - EME/EMD Rev. A Models
Installaon and Operaons Manual

This heat pump provides heated and chilled soluon as well
as oponal domesc water heang capability. Engineering
and quality control is built into every unit. Good performance
depends on proper applicaon and correct installaon.

The signal words  and
 are used on product labels and throughout this manual to
idenfy levels of hazard seriousness.
 Nocaon of installaon, operaon or maintenance
informaon which is important, but which is NOT hazard related.
 Indicates a potenally hazardous situaon or an
unsafe pracce which, if not avoided, COULD result in minor or
moderate injury, product or property damage.
 Indicates a potenally hazardous situaon which, if
not avoided, COULD result in death or serious injury.
 Indicates an immediate hazardous situaon which, if
not avoided, WILL result in death or serious injury.
 Used to highlight suggesons which will result in
enhanced installaon, reliability, or operaon.

Upon receipt of any equipment, carefully check the shipment
against the packing slip and the freight company bill of lading.
Verify that all units and packages have been received. Inspect
the packaging of each package and each unit for damages.
Ensure that the carrier makes proper notaon of all damages or
shortage on all bill of lading papers. Concealed damage should
be reported to the freight company within 5 days. If not led
within 5 days the freight company can deny all claims.
 Nofy Enertech Global Customer Service Department
of all damages within 5 days. It is the responsibility of the
purchaser to le all necessary claims with the freight company.

Protect units from damage and contaminaon due to plastering
(spraying), painng and all other foreign materials that may be
used at the job site. Keep all units covered on the job site with
either the original packaging or equivalent protecve covering.
Cap or recap unit connecons and all piping unl the unit is
installed. Precauons must be taken to avoid physical damage
and contaminaon which may prevent proper start-up and may
result in costly equipment repair.
Units should be stored in an upright posion at all mes and
should not be stacked unless specially noted on the packaging.

Special care should be taken in locang the unit. Installaon
locaon chosen should include adequate service clearance
around the unit. The Indoor Module should be located in a
condioned space where the ambient temperature remains
between 55
o
F and 95
o
F with a maximum RH of 78-80%.
It should be located in a way that piping or other permanently
installed xtures do not have to be removed for servicing.

Compare the electrical data on the unit nameplate with
packing slip and ordering informaon to verify that the
correct unit has been shipped.
Inspect all electrical connecons and wires. Connecons
must be clean and ght at the terminals, and wires should
not touch any sharp edges or copper pipe.
Verify that all refrigerant tubing is free of dents and kinks.
Refrigerant tubing should not be touching other unit
components.
Before unit start-up, read all manuals and become familiar
with unit components and operaon. Thoroughly check the
unit before operang.
Fill out the unit installaon form in the back of this IOM.

The dealer should instruct the consumer in the proper
operaon, maintenance, thermostat and indicator lights.
Also provide the consumer with the manufacturer’s Owner’s
Manual for the equipment being installed.

Enertech Global’s heat pumps and system installaons may
include electrical, refrigerant and/or water connecons. Federal,
state and local codes and regulaons apply to various aspects
of the installaon. Improperly installed equipment can lead
to equipment failure and health/safety concerns. For these
reasons, only qualied technicians should install an Enertech
Global built system.
Because of the importance of proper installaon, Enertech
Global does not sell equipment direct to homeowners. Internet
websites and HVAC outlets may allow for purchases directly by
homeowners and do-it-yourselfers, but Enertech Global oers
no warranty on equipment that is purchased via the internet or
installed by persons without proper training.
Enertech Global has set forth this policy to ensure installaons
of Enertech Global systems are done safely and properly. The
use of well-trained, qualied technicians helps ensure that your
system provides many years of comfort and savings.












Table of Contents

Related product manuals