EasyManuals Logo

Epson VT6-A901S Maintenance Manual

Epson VT6-A901S
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
VT6L Maintenance 2. General Maintenance
VT series Maintenance Manual Rev.2 5
2. General Maintenance
This chapter describes maintenance inspections and procedures. Performing maintenance
inspections and procedures properly is essential for preventing trouble and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
2.1 Maintenance Inspection
2.1.1 Schedule for Maintenance Inspection
Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and annual.
The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points must
be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
Inspection Point
Daily
inspection
Monthly
inspection
Quarterly
inspection
Biannual
inspection
Annual
inspection
Overhaul
(replacement)
1 month (250 h)
Inspect every day
2 months (500 h)
3 months (750 h)
4 months (1000 h)
5 months (1250 h)
6 months (1500 h)
7 months (1750 h)
8 months (2000 h)
9 months (2250 h)
10 months (2500 h)
11 months (2750 h)
12 months (3000 h)
13 months (3250 h)
20000 h
h = hour

Table of Contents

Other manuals for Epson VT6-A901S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Epson VT6-A901S and is the answer not in the manual?

Epson VT6-A901S Specifications

General IconGeneral
BrandEpson
ModelVT6-A901S
CategoryRobotics
LanguageEnglish

Related product manuals