79
OPERATION
Fast feed-in
Operation_Pic_number:1
● Quick lift key (H) to 'Control' (H1), LED lights
up.
External rear controls
Operation_Pic_number:1
Pushbuttons (A) to the left or right of the rear
lamp for raising or lowering the lifting gear.
If the safety lock is actuated, External operation
is possible at any position of the Quick Lift
switch.
Press key. Implement is lowered to
maximum depth (floating position).
Release the button, the implement
returns to the selected working depth.
Fig.162
Fig.163
18.4 Working with the EPC
Hitching three-point implements
Operation_Pic_number:1
● With rotary switch (P3), set 100% position,
bar indicator (C).
● With rotary switch (P1), set 30 % lift height,
bar indicator (A1).
● Wait until indicator bar (A2) displays 0%.
Operation_Pic_number:1
● Quick lift key (H) to 'Control' (H1), LED lights
up.
● Lower the lifting arms by turning the depth
control (G) to the left. To raise the lifting arms,
turn the control to the right.
The upper and lower links are firmly attached to
the implement.
● Turn depth control (G) fully to the right or set
the quick lift switch (H) to Lift (H2). The imple-
ment is raised to the lift height limit (approx.
1/4 of the total lift height).
● By turning Rotary control (P1), the implement
can now be raised to the desired lift height.
Fig.164
Fig.165