95
OPERATION
Unlinking 3-point implements using
depth control
Operation_Pic_number:1
● Turn depth control (O) fully to the right.
● Quick Lift switch (P) at 'Control' (P1), LED is
lit.
● With depth control (O), slowly lower the im-
plement till there is no load on the top link,
then unhitch the implement.
● Release the catch hook and lower the hy-
draulics completely.
Setting the desired transport height
Operation_Pic_number:1
● Lower the implement completely.
● With rotary switch (P3), set 30 % lift, bar indi-
cator (A1).
● Wait until indicator bar (A2) displays 0%.
Fig.217
Fig.218
Operation_Pic_number:1
● Quick Lift switch (P) at 'Raise' (P2), LED is lit.
The implement is raised by about 1/4 of its lift
height.
● Using rotary switch (P3), select the desired
transport height.
Road haulage (transport lock).
● For road transport turn depth control (O) fully
to the right.
Fig.219