EasyManua.ls Logo

FERRI ZMT - Page 50

Default Icon
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50
ZMT-ZMTE
Rev. 5.1
TRANSPORT AND INSTALLATION
4.13
4.14
04-Rimozione imballo (ZM-ZMTE)
14) Position the hydraulic hoses correctly having them pass on the arm (A) and xing them with the appropriate
clip, using as reference the marks previously done on the hoses.
15) Activate the rotation hydraulic ram hoses as in the gure and x them to point “A” of the arm.
16) The movement hydraulic ram hoses however go directly to the attachment wall and are xed in position B.

Table of Contents