Chapter 3 INSTALLATION 3-1
3.1 GENERAL
CONNECTION PRINCIPLES 3-3
Cable selection – field bus cable 3-4
Cable selection – operating voltages 3-4
Connecting the cables to
the plugs/sockets 3-5
3.2 FIELD BUS NODE 3-7
Opening and closing the node 3-7
Configuring the valve terminal 3-9
Address selector switch 3-11
Summary of possible station
addresses/station numbers 3-12
Field bus baud rate and
field bus length 3-14
3.2.1 Type 03:
Connecting the operating voltages 3-15
3.2.2 Type 05:
Connecting the operating voltages 3-22
3.3 CONNECTING THE PROFIBUS
DP INTERFACE 3-29
3.3.1 Screen connection 3-30
3.3.2 Cable termination 3-31
3.4 CONNECTING THE
INPUT MODULES 3-32
Pin assignment 3-34
3.5 CONNECTING THE
OUTPUT MODULES 3-35
Pin assignment 3-37
VIFB13 - 03/05
IV
9701 NH