EasyManua.ls Logo

Fischer Panda 7K PMS - Ventilating the fuel system

Fischer Panda 7K PMS
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Instructions
Seite/Page 100 - Kaptitel/Chapter 6: Maintenance Instructions 22.10.19
6.8.1.3 Check electrolyte density
Fig. 6.8.1.3-1: Battery Measure the electrolyte density of individual cells with a
commercial hydrometer. The hydrometer reading (see table
on following page) indicates the battery’s state of charge.
During measurement, the temperature of the electrolyte
should preferably be 20 °C.
AttentionThe gases emitted by the battery are explosive! Keep
sparks and naked flames away from the battery!
Do not allow battery acid to come into contact with skin
or clothing!
Wear protective goggles!
Do not rest tools on the battery!
6.9 Ventilating the fuel system
Normally, the fuel system is designed to ventilate air itself i.e. as soon as the electric starter motor starts operation
the fuel pump starts working and the fuel system will be de-aerated after some time automatically. It is nevertheless
essential to ventilate the system as follows prior to the first operation (as all hoses are empty):
Attention:Generators with iControl system do not need a Failure
bypass switch. At these generators the fuel pump can be
activated by an option of the control panel. See Control
panel manual.
1. Main power switch „OFF“
Electrolyte density
in [kg/ l] Charge status
Normal Tropical
1.28 1.23 well charged
1.20 1.12 semi-charged, re-charge
1.12 1.08 discharged, immediately charge

Table of Contents

Related product manuals