Seite/Page 36 - Kaptitel/Chapter 2: 22.10.19
2.5.4.2 Arrangements after a long-term standstill (shutdown) / recommissioning (more
than 6 months):
Check the charge of battery and recharge if necessary. Consider the specifications of the battery manufacturer.
Check anti-freeze protection and level of the cooling water and refill if applicable.
Drain engine oil. Renew oil filter and oil according specification.
Remove preservation agent of the engine with petroleum.
Degrease the v-belt pulleys and install v-belt correctly. Check v-belt tension!
Disconnect turbocharger oil pressure line if existent and refill clean motor oil in pipe.
Keep engine shut-off lever in 0-position and turn engine several times by hand.
Clean air filter housing with petroleum, check air filter and renew if necessary.
Remove covers of the exhaust opening and the suction holes.
Connect battery. Close battery main switch.
Install impeller.
Open sea cock.
Check sea water filter.
Keep shut-off lever at generator in 0-position and activate starter for approx. 10 sec. Make a break for 10 sec. and
repeat procedure twice.
Visual inspection of the generator according to initial operation and start generator.
Notice: Fischer Panda recommendation:
After a long-term standstill a complete 150 h inspection
according to inspection schedule should be carried out.

Table of Contents