Technology
Components, Connections, and Dimensions
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 17
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com M0930207
❒ Remove the transport covers (1) from the insulated door(s) and ash
container as well as the cleaning devices (2).
❒ Remove the protective casing.
On the front of the boiler:
❒ Remove securing devices used during transportation on the left and right
side of the base.
❒ Remove two screws each on the left and right of the ash collecting plate
and remove the collecting plate.
❒ Pull out the floor insulation behind.
At the back of the boiler:
❒ Remove securing devices used during transportation on the left and right
side of the base.
❒ Lift boiler off pallet.