Technology
Components, Connections, and Dimensions
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 19
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com M0930207
3.3 Dismantling for location where positioning is difficult
If there is not enough room to bring in the pre-assembled boiler, certain
components can be dismantled.
This section shows the maximum possible disassembly. Only dismantle
the parts absolutely necessary to bring in the boiler.
3.3.1 Removing the stoker assembly and insulation
❒ Remove the fastening screws on the sound insulation hood of the stoker
assembly and remove the sound insulation hood.
❒ Lift the front part of the stoker assembly up and remove.
❒ Lift the back part of the stoker assembly up and remove.
❒ Remove the insulating cover.
❒ Remove the two screws and lock washers from the flaps of the controller
cover.
Caution: Do not lose the lock washers!