General
Standards, Design, Assembly
Froling GmbH, Industriestrasse 12, A-4710 Grieskirchen, Austria Page 9
www.froeling.com M0930207
7. Where fans are used in the fuel storage area, they should be
installed so as not to create negative pressures in the room
where the boiler is located.
If these, or other indications, suggest that infiltration air is inadequate,
additional combustion air should be provided from the outdoors.
If a mechanical ventilation system (air exchange or heat recovery) is
already present in the home it may be able to provide sufficient
combustion make-up air for the solid fuel fired appliance. The ventilation
system may need to be re-balanced after installation of the Froling P4.
Canadian installations must conform to ANSI/NFPA outside air
requirements of 1 sq. Inch per 2.5cm (1,000Btu/hr) (.30kW/hr).
1.2.5 Combination with storage tank
We recommend that you use the pellet boiler with a storage tank, as this
allows you to achieve a reduction in start-up and shut downs within the ideal
performance range of the boiler.
Please contact your installer or a Fröling technician directly for the right
measurements of the storage tank.
If your P4 Pellet boiler has been installed with a Thermal Storage
System, this system may require periodic maintenance. Please review
the periodic maintenance requirements of your thermal storage system
with your installer.