EasyManua.ls Logo

Froling P4 - Boiler Operation

Froling P4
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technology
Components, Connections, and Dimensions
Page 24
M0930207 I
3
Igniter
Fit the clamp to the igniter tube using screws
Fix the cable with the cable ties supplied.
There must not be any loose cables in the area of the igniter.
Only connect the power supply after completing assembly.
Notice! The individual units should be checked by a qualified
technician and adjusted if necesary during initial start-up.
3.4 Assembling the pellet boiler
3.4.1 Before Installation
Checking the seal of the ash doors
Open the door
Insert a sheet of paper at the top between the door and boiler.
Close the door.
Try to pull the sheet of paper out.
If the paper cannot be removed:
The door seal is OK and the settings are correct.
If the paper can be removed:
The door is not sealed properly and must be adjusted!
Check the seal again after positioning the doors.
Repeat the procedure at the bottom of the ash door and on the side of the
door handle above and below the door handle as well as at the same
positions on the other ash door.

Table of Contents

Other manuals for Froling P4

Related product manuals