Installation
Install delivery system
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 43
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com M0930207
Lay the hose lines to the boiler, through
identified openings at the back plate and install
with hose clamps to the identified connections.
WARNING! Observe the label for the
suction line and the return-air line on the
silo suction probe and boiler. Ensure correct
connection!
Suction line: hose line to left connection (1)
on the back of the boiler.
Return-air line: hose line to right connection
(2) on the back of the boiler.
WARNING! When connecting the hose
lines, beware of potential equalisation!
Page 12, Proper Hose Grounding
Mount the included Safety Placard.
3.6.4 Pellet storage area
For the universal suction system, the pellet store must be built with an
inclined floor!
The following picture shows the most important components: