Technology
Components, Connections, and Dimensions
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 27
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com M0930207
❒ Remove the screw and lock washer on the bottom of the controller cover.
❒ Remove the controller cover.
❒ Hang the insulated door to the boiler base and secure with lock bolt.
❒ Take the two covers for the ash containers out of the ash containers,
position and secure with clamps.
❒ Put the left and right ash containers onto the ash screws and secure with
lever.
❒ Replace the controller cover after connecting to the power supply.