EasyManua.ls Logo

Froling P4 - Page 27

Froling P4
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technology
Components, Connections, and Dimensions
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 27
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com M0930207
3
Remove the screw and lock washer on the bottom of the controller cover.
Remove the controller cover.
Hang the insulated door to the boiler base and secure with lock bolt.
Take the two covers for the ash containers out of the ash containers,
position and secure with clamps.
Put the left and right ash containers onto the ash screws and secure with
lever.
Replace the controller cover after connecting to the power supply.

Table of Contents

Other manuals for Froling P4

Related product manuals