Questions? Call (315) 298-8510, or visit us online at www.fulton.com
Lead / Lag Configuration 2
Figure 23 – Lead / Lag Screens Page 2
Lag Boiler Start Delay: Defined in units of Minutes/Seconds. Determines the time required before the
ModSync will enable a lag boiler after it has reached its enable point.
Lag Boiler Stop Delay: Defined in units of Minutes/Seconds. Determines the time required before the
ModSync will disable a lag boiler after it has reached its disable point.
Lead Boiler Start Deviation: Defines how many degrees below setpoint before the ModSync will enable
the Lead boiler.
Lead Boiler Stop Deviation: Defines how many degrees above setpoint before the ModSync will disable
the lead boiler.