Docking Cart Setup
11-2 LOGIQ e – Basic Service Manual
5461614-100 English Rev. 6
Overview
Contents in this chapter
• ‘Overview’ on page 11-2
• ‘Set Up Docking Cart’ on page 11-4
• ‘Cart Using’ on page 11-40
• ‘Docking Cart Functions (Theory)’ on page 11-44
• ‘Diagnostics/Troubleshooting’ on page 11-52
Introduction
This chapter contains this information:
•
• How to setup Docking Cart. Included are references to a
procedure that describes how to receive and unpack the
equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual setup, and
how to check and test the unit and external peripherals for
electrical safety are included in this procedure. Also
included in this section are guidelines for transporting the
unit to a new site.
• The procedures for mounting the system to LOGIQ e and
releasing the system from Docking Cart.
• Explain the Docking Cart’s concepts, component
arrangement, and subsystem function.
• Describes how to test and adjust the functions. These tests
are optional. You may use them to check the system for
errors.
• Describes how to setup and run the tools that help Docking
Cart operation. Cart and board level diagnostics are run
whenever power is applied. Some Service Tools may be run
at the application level.