EasyManuals Logo

GE LOGIQ e Basic Service Manual

GE LOGIQ e
427 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #336 background imageLoading...
Page #336 background image
Docking Cart Setup
11-8 LOGIQ e – Basic Service Manual
5461614-100 English Rev. 6
Receiving and Unpacking the Equipment
When a new Docking Cart arrives, check that any components
are not damaged and are not in short supply. If shipping
damage or shortage occurs, contact the address shown in
Chapter 1.
Unpacking Docking Cart
CAUTION
The crate with the Docking Cart weighs approximately 59 kg.
Be prepared for a sudden shift of weight as the unit is removed
from its base (pallet).
Table 11-3: Procedure to take out Docking Cart
No. Steps Corresponding Graphic
1. Cut off the two packing strap
(1-2) and remove them.
Then remove the two
reinforce cardboards and
remove the top cover.
2. Rotate the knob
counterclockwise until it is
loose and remove it.

Table of Contents

Other manuals for GE LOGIQ e

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ e and is the answer not in the manual?

GE LOGIQ e Specifications

General IconGeneral
Power Supply100-240 VAC, 50/60 Hz
TypeUltrasound System
Imaging ModesB-Mode, M-Mode, Color Doppler, Power Doppler
Applicationsabdominal, cardiac, vascular, OB/GYN, musculoskeletal, small parts
Probeslinear, phased array
PortabilityPortable
ConnectivityDICOM, USB, Ethernet

Related product manuals