DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 71
8-2-29 CWD64 Assy
8-2-29-1 Tools
Common philips screwdrivers
8-2-29-2 Preparations
Shut down the system and switch off the main breaker.
8-2-29-3 Removal procedure
1.) Remove the Side Right Cover. Refer to the 8-2-14 "Right or Left Side Cover" on page 8-47.
2.) Remove the EMI Cover R. Refer to the 8-2-24 "EMI Cover L and R" on page 8-62.
3.) Remove the RFC Assy. Refer to the 8-2-32 "RFC Assy" on page 8-77.
4.) Disconnects the CWD64 cable.
5.) Pull out the CWD64 Assy located in #3 from Nest box. Refer to the Figure 8-111.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-29-4 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-111 CWD64 Assy
Table 8-30 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-29. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-9-3
CWD64 Assy Function Validation Procedure
Section 4-3-5
System CFM and PWD Checks
Section 10-5-2
Functional Checks (See Also Chapter 4)
Section 10-5-5
Physical Inspection
CWD64 Assy
CWD64 cable

Table of Contents

Other manuals for GE LOGIQ P6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P6 and is the answer not in the manual?

GE LOGIQ P6 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P6
CategoryMedical Equipment
LanguageEnglish

Related product manuals