EasyManua.ls Logo

GE Vivid q N - Page 436

GE Vivid q N
698 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION FQ091019, REVISION 2 VIVID Q N SERVICE MANUAL
7-78 Section 7-4 - Performing Front End (FE) Diagnostics
12.)Use the tools provided to scroll through the channels and view the results, as previously described.
13) When done, trackball to the Close button and press Set to close the View Report window.
14) Select the fourth report (Signal SNR); the report is highlighted in the Reports list, and the
corresponding results are shown in the Report window below, as shown in Figure 7-51.
Figure 7-50 View Test Log - ACW BPF Test - BPF2

Table of Contents

Related product manuals