EasyManua.ls Logo

GE Vivid q N - Page 435

GE Vivid q N
698 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION FQ091019, REVISION 2 VIVID Q N SERVICE MANUAL
Chapter 7 - Diagnostics/Troubleshooting 7-77
7) When finished reviewing the first report, trackball to the Exit button and press Set to close the View
Report window.
8) Select the second report (BPF1); the report is highlighted in the Reports list, and the corresponding
results are shown in the Report window below, as shown in Figure 7-49.
9.) Use the tools provided to scroll through the channels and view the results, as previously described.
10) When done, trackball to the Close button and press Set to close the View Report window.
11) Select the third report (BPF2); the report is highlighted in the Reports list, and the corresponding
results are shown in the Report window below, as shown in Figure 7-50.
Figure 7-49 View Test Log - ACW BPF Test - BPF1

Table of Contents

Related product manuals