EasyManua.ls Logo

GE Vivid q N - Page 596

GE Vivid q N
698 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION FQ091019, REVISION 2 VIVID Q N SERVICE MANUAL
8-90 Section 8-4 - SafeLock Cart Components Replacement
8-4-14-4 Top Shelf Installation Procedure
1) Carefully position the Top Shelf on the upper assembly and replace and fasten the rear and lower
retaining screws.
2.) Replace and reconnect the Main Harness, Peripheral power cable as described in "AC Distribution
Assembly Installation Procedure" on page 8-75 and connect the LAN cable.
3.) Install the Gas Spring as described in Gas Spring Removal Procedure section, page 8-84.
4.) Return the USB Box as described in the "USB Board Installation Procedure" on page 8-83.
5.) Fasten all cables in position using new cable ties.
6.) Return the Lower Cover (Rear) as described in the "Lower Cover (Rear) Installation Procedure" on
page 8-73.
7.) Return the Upper Cover (Rear) as described in the "Upper Cover (Rear) Installation Procedure" on
page 8-66.
8.) Reconnect all required peripherals to the SafeLock Cart.
9.) Reconnect the AC adapter and all cables to the Vivid q N portable ultrasound scanner.
10) Proceed to perform the following functionality tests:
- "SafeLock Cart - Grounding Continuity" on page 10-22
- "SafeLock Cart - Chassis Current Leakage Test" on page 10-24
Figure 8-105 Top Shelf - Rear Retaining Screws
Top Shelf rear retaining
screws

Table of Contents

Related product manuals